Links
Notes
Owner/operator: Pucobre in partnership with Codelco (40%)
Projected capacity: 45 ktpa cathode
Media
- Sep-26: Codelco Leverages Pucobre Financing to Develop Tovaku Copper Project in Chile (checked 8-Sep-26)
Created 8-Sep-26;
Owner/operator: Pucobre in partnership with Codelco (40%)
Projected capacity: 45 ktpa cathode
Created 8-Sep-26;