Also known as Gaby
Gabriela Mistral, formerly known as Gaby, is a copper mine operated by Chile's state-owned Codelco in the Atacama Desert, approximately 120 km southwest of Calama. Commissioned in 2008, it exploits a low-grade porphyry copper deposit through open-pit mining, heap leaching, solvent extraction and electrowinning (SX–EW), producing high-purity copper cathodes. The operation is notable for its early adoption of autonomous haulage and its water management challenges in an extremely arid environment. Production declined to approximately 82,000 tonnes of copper in 2025. In November 2026, environmental authorities approved an US$868 million continuation project designed to extend operations until 2055 and transition away from continental groundwater sources.
Links
Notes
Owner–operator: Codelco (Corporación Nacional del Cobre de Chile), 100% state-owned.
Nearest settlement: Sierra Gorda, approximately 75 km in a straight line; Calama is the larger regional service centre
Elevation: 2,660 m above sea level
Workforce: 494 direct employees at end-2025; approximately 4,000 including contractors
Commissioning: May 2008, originally operated by Minera Gaby S.A.; integrated into Codelco as División Gabriela Mistral in 2012
Mineral resources (end-2025): 451 Mt ore grading 0.30% Cu; approximately 1.4 Mt contained copper
Mineral reserves (end-2025): 121 Mt ore grading 0.36% Cu; approximately 0.4 Mt contained copper
Mine type: Open pit; low-grade porphyry copper deposit, with substantial oxide and secondary-enrichment mineralisation
Processing: Three-stage crushing, acid curing, dynamic heap leaching, solvent extraction and electrowinning
Products: High-purity copper cathodes
Mineral processing: Maximum average mining rate 91.1 Mt/year; processing capacity 46 Mt/year; authorised cathode capacity up to 150 kt/year
Copper production: 103.1 kt in 2024; 82 kt in 2025 (down 20.3%, principally due to lower ore grades); 56.7 kt in January–September 2026
Technology: Pioneer of autonomous haulage; introduced driverless mining trucks in 2008, among the first commercial applications worldwide
Projects:
- Continuidad Operacional y Transición Hídrica — US$868 million planned investment, approved environmentally on 16 November 2026; intended operational continuation through 2055
- Water transition: Replacement of existing groundwater-well supplies under normal operating conditions from 2036; addition of sodium-chloride-assisted leaching from 2035.
Köppen climate type: BWk — Cold desert climate
Sustainability: The Copper Mark responsible-production recognition and Chain of Custody certification; product carbon-footprint verification under Chile's Huella Chile programme.
Media
- Nov-26: Codelco’s $866 million Gabriela Mistral extension clears key hurdle (checked 24-Nov-26)
Created Sep-25; updated Nov-26