The Sierra Gorda open-pit copper and molybdenum mine in Chile is a large mining project with a long-term operational perspective, commissioned in June 2014. The Sierra Gorda mine is located in Chile – in the Atacama Desert in the Antofagasta region, approximately 60 km south-west of the city of Calama in the north of Chile, at an altitude of approximately 1700 m. The Catabela area is currently being exploited with a target mining depth of approximately 1000 m.
Links
- https://kghm.com/en/our-business/mining-and-enrichment/sierra-gorda
- https://www.south32.net/what-we-do/our-locations/americas/sierra-gorda
- https://www.sgscm.cl/
- https://goo.gl/maps/3zpbzNKTbqo2YXRi7
- https://www.mindat.org/loc-432839.html
Notes
Owner: KGHM Polska Miedź 55%; South32 45%; jointly controlled JV
Operator: Sierra Gorda SCM; independently/self-managed JV rather than operated directly by either shareholder
Start production: 2015
Mine life: Current reserve basis 2045 - upside potential through Catabela Northeast and deeper mineralisation
Workforce: 1,796 employees + 3,248 operational contractors = ≈5,044 people (2025)
Nearest settlements: Sierra Gorda village, ≈4–4.5 km; Sierra Gorda commune 1.47 k inhabitants (2024 census). Calama 166 k inhabitants, ≈60 km NE.
Operations: Large-scale open-pit porphyry Cu-Mo deposit; Catabela pit; sulphide + oxide mineralisation. Mill. Flotation plant.
Resource: 1.87 Bt @ 0.37% Cu, 0.016% Mo, 0.06 g/t Au; 0.44% CuEq; JORC, 100% basis, July 2026
Reserve: 1.10 Bt @ 0.39% Cu, 0.016% Mo, 0.06 g/t Au; 0.46% CuEq; reserve life extended to ≈2045
Processing capacity: ≈130.9 kt ore/day average in 2025, roughly 48 Mtpa.
Production: 165.3 kt contained/fine Cu in 2025; KGHM reporting basis = 157.9 kt payable Cu in concentrate. No cathode production.
Co-products: Mo concentrate: 4.2 kt Mo in 2025; gold and silver recovered as minor by-products in Cu concentrate
Projects
- Fourth grinding line: Under construction from 2026; ≈US$725 M; capacity ≈48 → 60 Mtpa; expected ≈20% increase in Cu + associated-metal output; completion end-2029, full capacity H2 2030
- Catabela Northeast: Priority exploration target ≈3 km from current operations; mineralisation open at depth; preliminary geological potential several Bt, but this is exploration potential, not yet a declared resource
- Sierra Gorda Oxide: ≈110 Mt surface oxide material under evaluation; heap-leach/SX-EW concept ≈30 ktpa Cu cathode; project/study, not current production
- Seawater supply via ≈144 km pipeline; avoids reliance on local continental freshwater
- 100% renewable electricity since 2023
Köppen climate type: BWk - Cold desert climate
Strategic character: Very large, low-grade, long-life Cu-Mo system; scale, brownfield expansion and resource conversion more important than grade.
Media
- Oct-26: KGHM, South32 kick off $725M Sierra Gorda expansion (checked 5-Oct-26)
- Aug-26: South32 boosts Sierra Gorda ore reserve estimate by 61% (checked 27-Aug-26)
- May-26: Sierra Gorda plans $100M exploration push, mine-life extension in Chile (checked 19-May-26)
- Nov-25: KGHM profit rises on Sierra Gorda strength, higher prices (checked 24-Nov-25)