Andina is a major copper mine operated by Chile’s state-owned Codelco in the Andes Mountains, northeast of Santiago, at elevations of 3,700–4,200 metres. Mining began in 1970, exploiting the large Río Blanco porphyry copper–molybdenum deposit. Following the closure of underground mining in 2025, production is concentrated in the Sur Sur open pit, yielding approximately 180,000 tonnes of copper annually, primarily in concentrate, alongside molybdenum. Andina holds substantial copper resources and is undergoing infrastructure modernisation. A joint mining plan with neighbouring Los Bronces, operated by Anglo American, aims to improve resource recovery and increase copper production from around 2030, subject to permitting. High-altitude conditions, water management and environmental constraints remain important operational challenges.
Links
- https://www.codelco.com/andina
- https://goo.gl/maps/DuPSXeYHviccw8X27
- https://www.mindat.org/loc-195648.html
Notes
Operator/owner: Codelco
Nearest settlement: Los Andes (57 kinh, 41 km); smaller settlements include Río Blanco and Saladillo
Elevation: 3,700–4,200 m above sea level - High-altitude conditions, snow and avalanche hazards, water availability, tailings management and environmental permitting
Work force: 1,600
Start operations: 1970
Mineral resources: 5.005 Bt ore grading 0.73% Cu; 36.7 Mt contained copper (December 2025).
Mineral reserves: 914 Mt ore grading 0.84% Cu; 7.7 Mt contained copper (December 2025).
Operations: Sur Sur open-pit mine; Río Blanco underground mine; concentrator and associated ore-handling infrastructure
Copper production: 200 ktpa
Co-product: Mo ~ 15 ktpa
Projects:
- Traspaso Andina: US$1.65 billion investment; new primary crushing and ore-transfer infrastructure at Nodo 3.500; approximately 4.8 km conveyor tunnel; capacity around 88 kt ore/day. Phase 1 inaugurated in January 2022; construction completed August 2025.
- Andina–Los Bronces Joint Mining Plan: Definitive agreement between Codelco and Anglo American completed June 2026. Integrated extraction and processing plans for adjacent deposits; additional 2.7 Mt Cu over 21 years, averaging approximately 120 ktpa across both operations, shared equally; at least US$5 billion additional pretax value. Joint plan targeted from approximately 2030, subject to environmental permits; no major new mine infrastructure envisaged.
- Desarrollo Futuro Andina: Longer-term development alternatives under consideration; historically envisaged expansion of ore-processing capacity to 150 kt/day. Project scope and implementation remain uncertain.
- Water management: Located in the water-stressed Aconcagua basin. Proposed Ovejería water-recirculation system intended to recover approximately 4.2 million m³/year initially, with further expansion envisaged from 2035
Responsible production: The Copper Mark; conformance reaffirmed March 2025
Köppen climate type: ET - Tundra
Media
- Nov-26: Codelco halts Andina mine as tailings spill threatens river (checked 16-Nov-26)
- Jun-26: Anglo American, Codelco to add 2.7Mt copper with no new mine (checked 25-Jun-26)
- Jan-22: Codelco adds 30 years to Andina copper mine (checked 25-Jun-26)
Created Sep-25; updated Jun-26, Nov-26